Lot Tasks & Schedule
Manage tasks, schedule items, inspections, and procurement on a lot using the tabbed interface.
Overview
On a lot's detail page, the tabs below the lot summary let you view and manage all work items on the lot. Tasks are organized by type and grouped by location, making it easy to focus on what needs attention.
Understanding the Tabs
Four tabs filter the work items displayed:
Switching tabs updates the list below β the tab you're on is remembered in the URL, so you can share or bookmark a specific view.
Task Status Summary
Above the task list, four statistic counters give you an at-a-glance view of task health:
Total β how many tasks match the current tab
Overdue β tasks past their due date
Due Today β tasks due today
Upcoming β tasks due in the future
β οΈ Action needed: If you see overdue tasks, prioritize them to keep the lot on schedule.
Tasks Grouped by Location
Tasks are organized into sections by location (e.g., Kitchen, Master Bath, Exterior). Each location section shows its own AG Grid table with all the tasks at that location, sorted by the date work can begin.
To add a new location section:
Click the New Location button.
Select from a list of predefined locations or type a custom name.
The new section appears and you can start adding tasks to it.
βΉοΈ Note: A task location describes where inside the home the work happens. It has nothing to do with the lot's map pin, which places the lot geographically β see Community and Lot Locations for that.
How to Create a Task
Click the floating + button in the bottom-right corner of the page.
Fill in the task details:
Location β select or type where the work is (e.g., Kitchen, Garage).
Type β choose Task, Schedule, Procurement, or Inspection.
Trade β the trade category (e.g., Plumbing, Electrical).
Trade Partner β the company assigned to do the work (requires a trade selection first).
Description β select from templates or type a custom description.
Photo β optionally attach a photo.
Set the schedule fields:
Work Can Begin β the earliest date work can start (not shown for procurement).
Days to Complete β how many days the work should take (1β90, not shown for procurement).
Date Due β the deadline for the task (required).
For Schedule type tasks, you can additionally set:
Critical Path β toggle on if this task is on the critical path.
Stage β select which construction stage this task belongs to (only when critical path is on).
For Task type items, you can optionally create a Work Order at the same time.
Click Save. Use Save and Create Another to quickly add multiple tasks in a row.
βΉοΈ Tip: When selecting a description, you can choose from existing templates to save time. Switch to the text box if you need a custom description.
How to Edit a Task
Click any task in the list to open its details. From here you can update any field, including dates, description, trade partner, and more.
When editing a schedule task and changing its due date, you may see two additional options:
Overlap with next task β number of days the current task overlaps with the next one.
Push out schedule β number of days to push subsequent schedule items forward.
These fields help you adjust the downstream schedule when one task's timeline changes.
Archiving a Task
To remove a task from the active list, open the task and click Archive. Archived tasks no longer appear in the task list or count toward the status summary.
Printing Lot Tasks
Click the print button (printer icon) in the tab bar to generate a printable report of the lot's tasks and inspections. The report opens in a new browser tab, ready to print or save as PDF.