Trade Partner Portal
Learn how to access and use the Trade Partner Portal to check your open work, your on-time performance, reports, plans, and contacts.
Overview
The Trade Partner Portal is your own page with the builder. It shows how much work you have open, how your finished work has been landing against the dates you were given, links to your reports and plans, and who to call at the builder — all in one place. No login, no account.
✅ Bookmark it! Your portal link never changes and always shows the most up-to-date information. Save it as a bookmark for quick access anytime, or share it with your team.
How to Access the Portal
There are two ways trade partners receive their portal link:
Automatic daily emails — When you have active items, TPTM will regularly email you a link to your portal along with your daily reports.
Shared by your builder — Your builder can also send you the portal link directly at any time.
Simply click the link to view your portal — no TPTM login is required.
⚠️ Anyone who has the link can open your portal. Treat it like any other private link, and only share it with people on your team who should see this information.
Your work at a glance
The row of boxes across the top of the portal is a snapshot of where you stand right now:
Active tasks — everything assigned to you that isn't finished yet, and how many lots and communities that spans.
Due today — how much of that is due today.
Overdue — how much is already past its date, and how far past on average.
Back charges — the total of any active back-charge work orders the builder has recorded against you.
A zero here means you're clear, not that something failed to load.
Your performance
This section is the one to check before a conversation with your builder. It looks at the work you have finished and scores each task against the date you were given.
How each task is scored
Finishing on the date counts as on time. Finishing before it counts as early. Both count in your favor.
Scheduled work is measured against the window you were originally given — not against a date someone changed after the fact. If the window was wider than the job needed, that slack is yours.
Days are counted as working days, and holidays on the builder's calendar don't count against you.
What you'll see
On-time rate — the big number. It's the share of your finished tasks that met or beat their date. Beside it: how many were on time, how many were late, your typical result, and your best and worst in this window.
Timeliness distribution — a column for each outcome, from "6+ days late" on the left to "6+ days early" on the right. A tall middle with short tails means predictable work, which reads better than a high average with a wide spread.
Performance by community / task type — the same score broken out by where the work was, or by what kind of work it was. Communities are listed worst first, so anything needing attention is at the top.
Anywhere you see a ? next to a heading, click it for a short explanation of how that number is figured.
Changing what's included
Four controls sit above the numbers, and every number below follows them:
Trade — narrow to one of your trades. This also updates the report links and the lot list further down the page.
Community — narrow to one community.
Period — the last 30, 60, or 90 days, or pick Custom to set your own From and To dates.
Task type — Schedule, Task, or Inspection. Leave it on All to include everything.
A sentence under the controls always spells out exactly what you're looking at, for example: "109 completed tasks · all work · all trades · all communities · last 30 days". Once you've changed anything, a Reset filters button appears to put it all back.
💡 Your filters are saved in the page address, so you can bookmark a particular view — or copy the address out of your browser and send it to someone, and they'll see exactly what you saw.
If nothing you've finished matches the filters, the section says so and suggests widening the date range or clearing the task-type filter.
Reports
The Reports section provides quick links to key reports for your trade partner. The available reports are:
Schedule Calendar — View your scheduled tasks on a calendar, lot by lot, with each of your task types in its own colour. Click a lot's name for its address and construction manager's contact details. Your builder can also choose to show a few details about each lot beside the lot name, such as its actual start, projected close, or build days.
Task List — A full list of all your tasks, with options to filter by All, Tasks only, or Schedule only.
Tasks by Lot — See your tasks organized by lot, with the same filter options as the Task List.
Every option is a plain link you can see and click directly — nothing is hidden behind a menu. Whichever trade you've picked at the top of the page is already applied to the report you open.
Plans
Pick a lot from the list to see its plan number and open the builder's file folder for that lot in a new tab. If you've filtered to one trade, the list only shows lots you have work on for that trade. A lot with no files linked shows No files linked instead of a button.
Your contacts
This is who the builder has on file for your crews. Each person shows their name, the trades they cover, and a Primary badge if they're your main contact. The phone and envelope buttons beside each name call or email that person directly — handy on a phone.
If no contacts are assigned, you'll see the message "No contacts assigned".
Telling us something's wrong
At the bottom of the portal, Provide feedback opens your email app so you can tell us about a wrong date, a lot that shouldn't be there, a report that won't open, or something you wish the portal did. The portal is anonymous, so please include your company name in the message.
Viewing the portal in Spanish
A language dropdown in the dark bar at the top of the portal, to the right of your company name, switches between English and Español. Choosing Español puts the portal's headings, labels, buttons, and explanations into Spanish. Your filters stay exactly as they were.
If you open a report (Schedule Calendar, Task List, or Tasks by Lot) while the portal is in Español, the report opens in Spanish too, so you don't need to switch again. Each report also has its own language dropdown at the top, which doesn't print.
💡 Task descriptions and locations show in Spanish when the builder has entered a Spanish version. Anything without one stays in English, so nothing is left blank. A few parts stay in English for now: the charts in Your performance (the on-time score, the distribution, and the breakdown), and the task names inside the Schedule Calendar's day cells.
Special Portal States
Trade Partner Not Found — If the portal link is invalid or the trade partner doesn't exist, you'll see a "Trade Partner Not Found" message.
Portal No Longer Active — If the trade partner has been archived by the builder, the portal will display a "Portal No Longer Active" message.
Something Went Wrong — If the portal can't load, you'll see a "Something Went Wrong" message asking you to try again later.
Frequently Asked Questions
How do I get my portal link?
How do I get my portal link?
Your builder will share your portal link with you directly. You'll also receive it automatically in your daily report emails when you have active items. If you haven't received a link yet, contact your builder and ask them to provide your Trade Partner Portal URL.
How do builders share the portal link?
How do builders share the portal link?
A date on here is wrong. Can I fix it?
A date on here is wrong. Can I fix it?
The portal is view-only. Every number, date, and assignment on it comes from your builder's schedule, so corrections have to be made on their side — contact your project manager and they can change it in TPTM. TPTM hosts the portal but doesn't set your schedule or your payments.
Why does my on-time rate change when I change a filter?
Why does my on-time rate change when I change a filter?
Because it's only ever counting the tasks you're currently looking at. Narrow to one community, one trade, or a shorter period and the rate is recalculated for just those tasks. The sentence under the filters always tells you how many finished tasks are in the count.
Someone changed the due date after the fact. Does that hurt my score?
Someone changed the due date after the fact. Does that hurt my score?
Not for scheduled work. Scheduled tasks are scored against the window you were originally given, so moving the date afterwards doesn't change your result. Other kinds of tasks are scored against their current due date.
Does work I finished on a home that has since closed still count toward my on-time rate?
Does work I finished on a home that has since closed still count toward my on-time rate?
Yes. Once you've finished a task, it stays in your performance numbers even after the builder closes out that home. Your on-time rate, task count, and breakdown in the portal match what your builder sees in their own Trade Partner Performance report for the same period. Closed homes do drop off the parts of the portal that show open work, like the lot list under Plans.
Can I update my contact information from the portal?
Can I update my contact information from the portal?
The portal is currently view-only. To update contact information, please reach out to your builder so they can make changes in TPTM.
What does the "Trade" filter do?
What does the "Trade" filter do?
If your company handles multiple trades (for example Plumbing and HVAC), the filter lets you look at one trade at a time. It applies to your performance numbers, your report links, and your lot list all at once.
I saved a Procurement report link. Why doesn't it show only procurement work?
I saved a Procurement report link. Why doesn't it show only procurement work?
Procurement is no longer a task type — work is now a Schedule item, a Task, or an Inspection. An older report link that filtered to procurement still opens, but it shows your overall report with no task-type filter applied. Use the Task List or Tasks by Lot links in the Reports section of your portal to filter by All, Tasks or Schedule instead.
What do I do if my portal says "Something Went Wrong"?
What do I do if my portal says "Something Went Wrong"?
The portal couldn't load. This is usually temporary. Wait a few minutes, then reload the page.
If it keeps happening, tap Show error details under the message, then tap Copy details. That copies a short technical message and the portal's web address, plus a Reference ID if one is shown — it can take a second to appear, and sometimes there isn't one. Paste them into an email to us at contact@tptm.pro and include your company name, so we can find exactly what went wrong.
Can I view the portal in Spanish?
Can I view the portal in Spanish?
Yes. Use the language dropdown at the top of the portal to switch between English and Español. Reports you open from the portal open in the same language. To share the Spanish view, copy the page address after switching. It includes lang=es.
Was this helpful?
More in Trade Partners
On Site ListWork OrdersSchedule Calendar ReportStill need help? Ask the team