Community Details
View community statistics, click them to filter the lots, manage lots (including bulk-adding them), and access community tools.
Overview
After clicking a community in the list, you land on its detail page. This page shows key statistics, the lots table, and gives you tools to manage the community and its lots. Most of the statistics can be clicked to show only the lots behind that number.
Community Statistics
At the top of the page, eight statistic pills summarize the community's current state:
Use these pills for a quick health check before diving into individual lots. Late Tasks, Late Walks, Needs Photo, On Hold and Missing Location are also filters: click one to show only the lots behind that number, in both the List and the Map. Active Lots, Open Tasks and Avg Build Time are not clickable. See Filtering Lots with the Summary Stats below.
Community Location
If the community has been pinned on the map, a Location section shows that pin on a small read-only map. The section is hidden entirely when the community has no coordinates โ add them with Edit. See Community and Lot Locations.
The Lots Table
Below the statistics, the lots table lists every active lot in the community. On desktop, you'll see these columns:
On mobile, the table shows a single column with the lot name and status tags for a cleaner layout.
List and Map Views
Above the table, a List / Map toggle switches how the lots are displayed. List is the default and shows the table described above. Map plots every active lot that has been pinned, so you can see the community as it actually sits on the ground.
Hover a pin (or tap it on a phone or tablet) to open a card with the lot name, address, status tags, last walk date, project manager, and current stage.
Click the card to open that lot's detail page.
When several lots are pinned, the map zooms to fit them all.
Lots without a location aren't on the map. A notice reports how many are missing โ for example, "3 lots have no location yet, so they are not on the map." They're still in the List view: to see exactly which lots they are, click the Missing Location pill at the top of the page and switch to List. The notice is hidden while any pill filter is on. If no lot has been pinned, the map falls back to the community's own pin, or shows a No lot locations yet empty state.
โน๏ธ Note: The Show archived switch is hidden in Map view, and archived lots never appear on the map. See Community and Lot Locations for how to pin your lots.
Build Days
The Build Days column shows two things for each lot: the number of days its build has taken so far, and a small colored number next to it showing how that compares to the assigned schedule template's target โ green and a minus sign means ahead of schedule, red and a plus sign means behind, gray zero means right on target. A lot with no schedule tasks yet, or currently on an active hold, shows "N/A" instead of a number. See Build Days for the full explanation, including why a delta can look unrealistically large.
Lot Status Tags
Tags appear next to a lot's name to highlight important states:
Walk (orange) โ The lot has not been walked today and needs attention.
On Hold โ The lot has an active schedule hold.
Archived โ The lot has been archived (only visible when "Show archived" is on).
Searching Lots
Use the search box above the table to filter lots by name or project manager. The search filters as you type. If nothing matches, the table says "No lots match your search." Clear the search box to see all lots again.
How to Filter Lots with the Summary Stats
The quickest way to find the lots that need attention is the summary stats at the top of the page. The filter applies to both the List and the Map.
Click the Late Tasks, Late Walks, Needs Photo, On Hold or Missing Location pill.
The pill is highlighted and shows a small โ, and a bar appears just above the lots saying what you are looking at โ for example "Showing lots with late tasks". Only the matching lots are listed, and only their pins are on the Map.
To look at a different group, click another pill. Only one of the five filters can be on at a time, so the new one replaces the old one.
To see all lots again, click the highlighted pill once more, or click Clear filter in the bar.
When no lot matches, the section says so โ for example "No lots on hold." โ with a Clear filter button to get back to the full list.
The filter works together with the search box (a lot has to match both) and with the List / Map toggle. It stays on while you move around TPTM, so you can open a lot from the filtered list, come back, and carry on where you left off. It is cleared when you refresh the page or open the community in a new tab.
โน๏ธ Tip: The same filters are available on your Field View home page, where they narrow the lots assigned to you.
How to Add a Lot
You can add lots one at a time, or create many at once with a naming pattern.
One at a Time
Click the Create button in the Lots section.
Fill in the lot details:
Lot Name (required)
Permit # and Date Issued for Permit
Plan #
Link to Files โ URL to external documents for this lot
Street Address
Location โ the lot's pin on the map. Click the map, drag the pin, type coordinates, or paste a "lat, lng" pair. Leave it empty if unknown.
Target Quarter โ the anticipated completion quarter (e.g., Y25 Q1)
Project Manager
Buyer
Start Date and Target Date
Click Save.
โน๏ธ Tip: You only need the lot name to get started. You can fill in the remaining details later by editing the lot.
In Bulk
If you need to add many lots at once โ for example, every lot in a new phase โ use Bulk-add Lots instead of creating them one at a time.
Open Tools โ Bulk-add Lots.
Enter a pattern for the lot names, using
#to mark where the number goes (e.g.,LOT-#). Repeat the#to zero-pad the number โ for example,LOT-###createsLOT-001,LOT-002, and so on.Enter the Start and End numbers for the range (e.g., 1 to 25 creates 25 lots).
Review the live preview. It lists the first several lot names that will be created and warns you if any of them already exist in this community.
Click Continue.
Type yes to confirm. This screen shows exactly how many lots are about to be created and reminds you that they'll be billed at your standard per-lot rate.
Click Create.
โน๏ธ Note: You can create up to 500 lots in a single batch, and each generated name can be up to 50 characters. Bulk-add Lots requires the Lot create permission and is hidden for archived communities. Bulk-created lots have no location โ pin them individually afterward if you want them on the map.
Show Archived Lots
By default, archived lots are hidden from the table. To see them, toggle Show archived to Yes above the table. Archived lots will appear with an "Archived" tag next to their name.
Community Tools
The community detail page provides several actions in the header area:
โน๏ธ Note: The Edit button is only visible to users with the Community update permission.
Missing Schedule Activity Notes
If any lots in the community have schedule activities that are missing notes, an inbox icon will appear next to the Create button. Click it to review and add the missing notes.
FAQ
What does "Late Walks" mean?
What does "Late Walks" mean?
A lot is counted as a "late walk" if it hasn't been visited (walked) today. That includes a lot nobody has walked yet โ a brand-new lot counts from day one. Lots on an active hold are never counted, because a hold pauses the lot.
How do I archive a lot?
How do I archive a lot?
Open the lot's detail page, click the โฎ button at the top-right, and select Archive. A confirmation dialog will appear showing you how many incomplete tasks exist on the lot. Review and click Archive to confirm. See Lot Details.
Can I sort the lots table?
Can I sort the lots table?
Yes. Click any column header to sort the table by that column. Click again to reverse the sort order.
Why don't I see the Project Manager column?
Why don't I see the Project Manager column?
On mobile devices, the table switches to a simplified single-column layout. Open the lot to see its project manager assignment.
Why is a lot missing from the Map view?
Why is a lot missing from the Map view?
The lot has no location set. Only lots with a map pin appear in Map view โ the notice above the map tells you how many are missing. To find them, click the Missing Location pill at the top of the page and switch to List. Open the lot, click Edit, and set its Location. Archived lots are excluded from the map as well.
Why does the Late Tasks number not match the number of lots shown?
Why does the Late Tasks number not match the number of lots shown?
The Late Tasks pill counts tasks, but the filtered list shows lots. One lot with three late tasks adds 3 to the pill and appears once in the list, so the number is usually higher than the number of rows. The other four filter pills count lots, so their numbers match the rows shown โ unless a search in the box above the table narrows the list further.
Why did the Map go blank when I clicked Missing Location?
Why did the Map go blank when I clicked Missing Location?
The lots behind that number have no pin, so there is nothing to put on the map โ the Map tells you how many matching lots have no location yet and offers a View list button. Switch to List to see them, then open each lot, click Edit, and set its Location. See Community and Lot Locations.
Why did my summary stat filter disappear after I refreshed the page?
Why did my summary stat filter disappear after I refreshed the page?
The filter you set by clicking a summary stat pill is only kept while you move around inside TPTM. Opening a lot from the filtered list and coming back keeps it; refreshing the page, opening the community in a new tab, or signing in again starts you unfiltered. Each community keeps its own filter. Just click the pill again to put it back.
Why don't archived lots show up while a summary stat filter is on?
Why don't archived lots show up while a summary stat filter is on?
The summary stats only count active lots, so their filters only ever show active lots โ even with Show archived turned on. Clear the filter to see the archived lots again.
Why is there no Location section on the community page?
Why is there no Location section on the community page?
The community hasn't been pinned on the map yet. Click Edit and set the Location โ the section appears once coordinates are saved.
Why does a lot show "N/A" for Build Days?
Why does a lot show "N/A" for Build Days?
Either the lot has no schedule tasks yet, or it's currently on an active hold โ both leave its build window undetermined until there's real schedule data (or the hold ends). See Build Days for details.
What does the "#" mean in the bulk-add pattern?
What does the "#" mean in the bulk-add pattern?
The "#" marks where the lot number goes. A single "#" never truncates the number โ for example, "LOT-#" from 1 to 150 creates "LOT-1" through "LOT-150". Repeating the "#" zero-pads the number to that many digits, so "LOT-###" creates "LOT-001" through "LOT-150".
What if some of the generated lot names already exist?
What if some of the generated lot names already exist?
The preview warns you if any generated names match existing lots in the community, but it won't stop you from continuing โ duplicate lot names are allowed.
How much does bulk-adding lots cost?
How much does bulk-adding lots cost?
Lots created in bulk are billed at your standard per-lot rate โ the same rate as creating lots one at a time.
Why don't I see Bulk-add Lots in the Tools menu?
Why don't I see Bulk-add Lots in the Tools menu?
Was this helpful?
More in Managing Work
Work OrdersCommunitiesLot Tasks & SchedulePay PointsStill need help? Ask the team