Introduction
What TPTM is, who it is for, and where to start in the help center whether you build homes or work as a trade partner.
Overview
TPTM is designed by builders for builders and trade partners, focused on simplifying work management across multiple lots and communities. Whether you're a superintendent, project manager, or trade partner, our platform streamlines communication and scheduling to save you valuable time.
This help center explains each part of TPTM in plain language. Each section contains guides, helpful videos, and answers to common questions so you can find what you need and get back to work.
Where to start
Pick the guide that matches what you do:
Field View — your home dashboard showing the lots assigned to you, summary stats, and flags that need attention.
Communities — view, create, and manage the communities where your lots are built.
Lot Details — everything about a single lot: buyer details, photos, holds, and the construction timeline.
Adjusting schedule — how to move a lot's schedule when a task's timing changes.
Trade Partner Portal — for trade partners: your open work, on-time performance, reports, plans, and contacts.
Admin Portal Overview — for administrators: members, invitations, roles, API keys, and usage reporting.
AI Connectors — connect Claude or Perplexity to TPTM so it can answer questions, pull reports and manage your lots and schedules, within your own permissions.
You can also browse the categories in the sidebar, or type a few words into the help center search.
Frequently Asked Questions
How do I get to TPTM to sign in?
How do I get to TPTM to sign in?
Go to tptm.pro and click Sign in at the top of the page. On a phone or a narrow window, tap the menu button (three lines) at the top of the page first, then tap Sign in at the bottom of the menu. To skip that step, bookmark tptm.pro/app instead — it takes you straight to the sign-in screen, or to your company's dashboard if you are already signed in.
Where do I go for help while I'm using TPTM?
Where do I go for help while I'm using TPTM?
Click the question-mark icon in the header at the top of TPTM. A help panel opens with a greeting and a way to send us a message. To report a problem, click the bug icon just to the left of the question mark — it opens the same panel with a bug report already started for you, so you only need to describe what went wrong.
Can I use TPTM in my phone's browser?
Can I use TPTM in my phone's browser?
Yes. Open TPTM in your phone's browser and sign in with the same details you use on a computer — there is nothing to install. The layout adapts to a smaller screen, with a search button and a navigation bar at the bottom.
You need an internet connection to load pages and save changes. If your signal drops while you are working, the information you already loaded stays on screen with a banner reading "You're offline — showing your most recent data." until you are back online, but you cannot save anything until then.
Is there a TPTM app I can install on my phone?
Is there a TPTM app I can install on my phone?
Not yet. A separate TPTM app for phones and tablets is being prepared, but it is not available to install today — you will not find it in the App Store or Google Play.
For now, use TPTM in your phone's browser: open TPTM and sign in as you would on a computer. Everything you do there is the same TPTM your office sees.
Why does TPTM sometimes ask me to reload?
Why does TPTM sometimes ask me to reload?
When a new version of TPTM is released while you have a page open, a small notice appears in the bottom-right corner reading A new version of TPTM is available. Click Reload when you are ready, or Not now to keep working — nothing on your page changes until you choose. See Updating to a new version of TPTM.
What should I do when TPTM says "Something went wrong"?
What should I do when TPTM says "Something went wrong"?
This screen means TPTM hit an unexpected problem with the page you were opening. Our team is notified automatically.
Tap Try again to reload the page, or Return to home to go back to your dashboard. If it keeps happening, send us the details:
Tap Show error details below the buttons. A short technical message appears. You may also see a Reference ID — it can take a second to show up, and sometimes there isn't one.
Tap Copy details, whether or not you see a Reference ID. The button changes to Copied, and the message, the page address and the Reference ID (if there is one) are ready to paste.
Open the help panel (the question-mark icon at the top of TPTM), paste the details into your message, and tell us what you were doing. If you don't see the question-mark icon, tap Return to home first.
If there is a Reference ID, it helps us find exactly what went wrong for you. Tap Hide error details to close the details again.
What does "We couldn't finish signing you in" mean?
What does "We couldn't finish signing you in" mean?
TPTM shows this screen when signing in keeps sending you back to the same page instead of opening it — for example, after you tap a report link in an email or text. Our team is notified automatically when it happens.
Tap Try again to reload the page. If you see the screen again, close the browser tab and open TPTM again, or tap Return to home to go to your dashboard. If it still won't open, send us a message from the help panel (the question-mark icon at the top of TPTM) and tell us which link you were opening.
What do I do if I can't see a page or button that a coworker can?
What do I do if I can't see a page or button that a coworker can?
What you can see and do in TPTM depends on the role your organization's administrator assigned to you. If something you need is missing, ask your administrator to review your role. Administrators can read more in Roles & Permissions.
Was this helpful?
More in User Guides
Sign in with PasskeysUpdating to a new version of TPTMDemo WorkspacesStill need help? Ask the team