Skip to main content
User Guides

Light and Dark Mode

Switch TPTM between Light, Dark, and System color scheme, where the theme toggle lives, and why report and portal links and printed pages are always light.

Overview

TPTM supports Light mode, Dark mode, and a System option that matches your device automatically. This is sometimes called dark mode, light mode, night mode, or a color scheme or theme toggle — this article covers all three options and where to find the switch.

Where is the toggle?

The color scheme control is a small row of three icons at the bottom of the left sidebar, just above the organization switcher. Hover over any icon to see its name. If the sidebar is collapsed to its narrow icon-only view, the toggle shrinks down to a single icon in that same spot.

How to change your color scheme

  1. Look at the bottom of the left sidebar for the three-icon toggle.

  2. Click the icon for the option you want: the monitor icon for System, the sun icon for Light, or the moon icon for Dark.

  3. The app switches immediately. Your choice is remembered the next time you open TPTM in this browser.

What each option does

  • System (the default): TPTM follows your device's own light or dark setting, and switches automatically if you change that setting on your device while TPTM is open.

  • Light: Always shows the light appearance, regardless of your device setting.

  • Dark: Always shows the dark appearance, regardless of your device setting.

ℹ️ Note: Your color scheme choice is saved in the browser you're using, not on your TPTM account. If you sign in on another computer or browser, you'll need to choose it again there.

Report and portal links are always light

Some TPTM pages are made to be shared outside the app — the ones you send as a link, print, or reach by scanning a QR code. These always open in the light appearance, for everyone:

  • Printable reports, including a trade partner's Task List, Tasks by Lot, and Schedule Calendar reports

  • Community and lot task reports

  • The lot page you land on after scanning a lot's QR code, and the printable QR code sheet

  • Printable work orders

  • The Trade Partner Portal

  • The community timeline you share with buyers

This is on purpose, not a setting that got missed. Anyone can open these links — trade partners, buyers, people with no TPTM account — so they look the same for everybody and match how they print. There is no toggle, link, or setting that makes them dark.

If you use Dark mode, you'll notice this when you open a report from inside TPTM: the report is light, and everything goes back to dark the moment you return to the app.

ℹ️ Note: Opening one of these pages does not change your own setting. Your saved choice is still Dark, and the rest of TPTM is dark again as soon as you go back to it.

Printing

Printed pages — including reports and the printable QR code page — always print in the light appearance, even if you're using Dark mode on screen. This is expected: it keeps printed pages easy to read and saves ink, and it's not a bug.

Frequently asked questions

When the left sidebar is expanded, the toggle is a small row of three icons at the bottom of the sidebar, just above the organization switcher.

If the left sidebar is collapsed down to a narrow strip of icons, the three-icon row condenses into a single small icon in that same spot, near the bottom of the rail. That icon matches whichever mode is currently active — a monitor for System, a sun for Light, or a moon for Dark — so you can tell your current setting at a glance. Tap it (on a touch device) or Tab to it and press Enter/Space (on a keyboard) to open a small menu with System, Light, and Dark, plus a Learn more link back to this article. Collapsing or expanding the sidebar never changes your saved color scheme — it just changes how the control looks.

If you're using a mouse, moving the pointer over the collapsed sidebar expands it back out to full width before a click can land on the compact icon, so you'll see the full three-icon toggle instead — the compact menu is for touch and keyboard use, where the sidebar doesn't expand on its own.

On a phone, tap the menu icon in the header to open the navigation menu — the color scheme toggle is at the bottom of that menu, above the organization switcher.

No. Color scheme is a personal display preference saved only in your own browser. It doesn't change what anyone else sees.

Your color scheme choice is saved per browser, not per account. Choose your preferred option again on each device or browser you use.

No. It's not hidden — while the sidebar is collapsed to its narrow icon view, the toggle condenses into a single small icon in the same spot, matching your current mode. Tap it, or Tab to it with a keyboard, to see the full System/Light/Dark choices.

No. Those pages always open light, even if the visitor's phone or computer is set to dark, and they don't show a toggle to change it — see Report and portal links are always light above.

No. Reports and portal links are always light for everyone. Your saved choice is untouched — it's still Dark, and the rest of TPTM is dark again as soon as you go back to it.

Yes. When the sidebar is expanded, Tab to the three-icon toggle and use the arrow keys to move between System, Light, and Dark, then press Enter or Space to select the highlighted option. When the sidebar is collapsed, Tab to the single compact icon and press Enter or Space to open its menu, then choose the option you want.