Create, edit and archive the reusable task templates your schedules are built from, and set each one's Abbreviation.

Overview

A task template is a reusable task: its trade, type, short code, description and duration. Your schedule templates, the batch scheduler and the task form all build tasks from them, so you set a task up once instead of typing it on every lot. Builder admins and project managers manage task templates on the Task Templates page under Settings.

  • Create a task template, or edit one you already have.

  • Give it an Abbreviation, the short code that shows on the schedule.

  • Archive a task template you no longer use.

Getting to the Task Templates page

  1. Open Settings from the sidebar navigation.

  2. Click Task templates.

The table lists every task template with its Type, Trade, Abbreviation, Description and Duration. Click a row to see the details.

How to create a task template

  1. On the Task Templates page, click Create.

  2. Choose a Trade and a Type (Schedule or Repeat).

  3. Optional: type an Abbreviation, such as FRM2.

  4. Type the Description, without the code in front of it, and set the Duration (days) from 1 to 90.

  5. Click Save. The new task template appears in the table.

How to edit a task template

  1. On the Task Templates page, click the task template's row.

  2. Click Edit.

  3. Change what you need and click Save.

How to archive a task template

  1. On the Task Templates page, click the task template's row.

  2. Open the More menu and choose Archive.

  3. In the Archive task template window, click Archive. The task template leaves the table.

Frequently Asked Questions

The Abbreviation is the short code for a task, like FRM2 or WIN/EXDR. It is optional. Tasks you schedule from the task template take the whole code, and it shows on the Overall timeline's day cells, in the Abbrev column of the Tasks Report and on your trade partners' Schedule Calendar. Where a task is named on its own, such as in a lot's task list or on a work order, it reads as the code and the description together: FRM2 - Install 2nd forms. Tasks themselves have no Abbreviation field; codes are set only on task templates.

Up to 10 capital letters, digits, &, / or ., with at least one letter. Examples are FRM2, WIN/EXDR, P&B and QC.1. A short code with one capital and up to three small letters, such as Ins, also works. If you type in small letters, they turn into capitals when you leave the field, except for a code like Ins. Leave the field empty if the task should have no code.

The code breaks one of the rules: it has a space or a hyphen in it (FR M, FRM-2), it has no letter (123), or it has a word of seven or more capital letters in a row (ORGANIZE). Change the code and the message goes away. The field stops accepting characters after 10, so a longer code cannot be typed.

Yes, for the tasks that use this task template's description. When you save a new abbreviation, those tasks that still carry its old code, or no code at all, switch to the new one, archived tasks included. Clearing the abbreviation clears it on those same tasks. A task that carries a different code keeps its own, a task with the same wording that is stored as a separate description keeps its code too, and tasks with a different description are never changed.

Yes. When you save a new description, your own tasks, locations and other task templates that share this task template's description switch to the new wording too, archived ones included. This includes tasks already scheduled from the task template. Anything with identical wording that is stored as a separate description keeps its old wording. Leading and trailing spaces are ignored. Saving the same description again changes nothing. Other companies on TPTM are not affected: they keep the wording they had.

Changing a description changes every one of your tasks, locations and task templates that use the same wording, so your role needs permission to edit all of them. If it does not, you see "You don't have permission to edit this task template." or "This text is also used by tasks, locations or templates you don't have permission to edit, so it can't be changed. Ask an administrator to make this change." Nothing is saved in either case. Ask an administrator to make the change or to update your role. See Roles and Permissions.

The codes were moved into their own field for you. A task template or task whose description started with its own code was cleaned up automatically, so "FRM2-Install 2nd forms" is now FRM2 in Abbreviation and "Install 2nd forms" in Description. You don't need to do anything. The code still shows wherever a task is named on its own, for example FRM2 - Install 2nd forms, and searching for FRM2 still finds the task.

If you open a task template whose description still starts with its code, the code appears in Abbreviation and the rest in Description. Click Save to store them apart.

Because those schedule templates still use the task template. The orange message in the Archive task template window says how many schedule templates still use it, followed by their names: the first ten, then "and N more". It is a heads-up, not a block, so you can still archive. Rows already using the task template keep it and can still be saved, but it can't be picked for new rows. If you would rather not leave those schedule templates behind, open each one first and choose an active task template for the affected rows. Schedule templates your role cannot view are not listed. See Scheduling Templates.

Those buttons only appear when your role allows you to create or update task templates. With read-only access you can open the page and view a task template, but not change it. Ask your administrator to check your role. See Roles and Permissions.

The trade you picked has been archived or is not available to your company. Refresh the page and choose another trade. An existing task template keeps its trade, so archiving a trade never stops you from editing the task templates filed under it.