Field View
Learn how to use Field View — your home dashboard showing assigned lots, summary stats you can click to filter the list, flag badges, and the lots that still need a map pin.
Overview
Field View is your home page in TPTM. It gives you a quick snapshot of all the lots assigned to you as a project manager, along with summary statistics that highlight items needing your attention. Think of it as your daily starting point — a single screen that tells you what to focus on today.
Field View is about your lots. To see what needs attention across every community, use Manager view, directly below Field View in the sidebar.
What Does Field View Show?
Field View is divided into five sections, from top to bottom:
Summary stat pills at the top
Nearby lots — the lots closest to where you're standing
Unconfirmed Pay Points — completed pay points not yet marked ready to pay, shown only when there are some
Lots Without a Location — your lots that still need a map pin, shown only when there are some
Assigned Lots table at the bottom
Summary Stats
Four stat pills appear at the top of the page:
Active Lots — The total number of lots assigned to you that are not on hold.
Overdue Tasks — The number of overdue tasks across your active lots. Displays in red when there are overdue tasks.
Late Walks — The number of active lots that haven't been walked today, including lots nobody has walked yet. Displays in orange when there are late walks.
Need Photos — The number of active lots that have no photos or whose most recent photo is more than 7 days old. Displays in yellow when there are lots needing photos.
Overdue Tasks, Late Walks and Need Photos are also filters: click one to show only the lots behind that number. Active Lots is your whole list, so it is not clickable. See Filtering with the summary stats below.
ℹ️ Note: Summary stats exclude lots that are currently on hold. This keeps your numbers focused on the lots you can actively work on.
Assigned Lots Table
Below the summary stats, an interactive table lists every lot assigned to you. The table includes:
Lot — The name of the lot
Flags — Colored badges that highlight items needing attention
Flag Badges
Each lot can display one or more flag badges:
A lot can show multiple flags at the same time (for example, both Walk and Photo).
Nearby Lots
The Nearby lots card shows the pinned lots within 1,000 feet of where you're standing, closest first — the fastest way to see what else is around you while you're out in the field.
The first time, click Show lots near me.
Allow location access when your browser asks.
After that, you do not need to click anything. As long as your browser keeps that permission, the card finds your position on its own each time you open Field View. If the permission is ever turned off or reset, the Show lots near me button comes back — click it to allow location again.
The three closest lots appear with their distances. Click the Show more button — it names how many are left — to see the rest.
Click Show map to see them plotted, along with a dot for your own position.
Unlike the rest of Field View, this card is not limited to your own lots. Any active, pinned lot in range appears, so you can spot a neighbouring lot that needs attention while you're already on that street. Your own lots are listed first, and the three collapsed rows fill with your lots before any others.
Each row shows the lot name and its community. For a lot that isn't yours, the community is followed by the responsible person — the project manager's name, Unassigned, or Another project manager when you can't see who it is. Status tags and the distance appear on the right.
Distances show in feet when you're within about a tenth of a mile, and in miles beyond that.
ℹ️ Note: Only lots that have been pinned on the map can appear here, no matter how close you are to them. See Community and Lot Locations.
Lots Without a Location
The Lots Without a Location section lists your lots that have no map pin yet, just above your assigned lots. Without a pin, a lot never shows in Nearby lots and its walks can't be checked as on site.
Each row shows the lot name, its street address and its community, ordered by community and then by lot. The section disappears once every one of your lots has a pin.
How to Access Field View
Field View is the default home page when you log in to TPTM or by selecting Field View in the navigation menu.
How to Use the Table
Filtering with the summary stats
The quickest way to narrow your lots is the summary stats at the top of the page. This works the same on a phone and on a computer.
Click the Overdue Tasks, Late Walks or Need Photos pill.
The pill is highlighted and shows a small ✕, and a bar appears just above your lots saying what you are looking at — for example "Showing lots with overdue tasks". Only the lots carrying that badge are listed.
To look at a different group, click another pill. Only one of the three filters can be on at a time, so the new one replaces the old one.
To see all of your lots again, click the highlighted pill once more, or click Clear filter in the bar.
When none of your lots match, the list says so — for example "No lots with late walks." — with a Clear filter button to get back to the full list.
The filter stays on while you move around TPTM, so you can open a lot from the filtered list, come back, and carry on where you left off. It is cleared when you refresh the page or open Field View in a new tab.
Filtering Lots
The table includes a Filters side panel that lets you narrow down the displayed lots:
Click the filter icon on the right side of the table to open the Filters panel
Filter by Flags to show only lots with specific badges (e.g., only lots flagged as "Walk")
Filter by Community to show lots from a specific community
Filter by On Hold status to include or exclude lots that are on hold
ℹ️ Note: By default, lots on hold are hidden from the table. To see them, open the Filters panel and clear the "On Hold" filter.
The Filters panel works together with the summary stat filter above it: with Late Walks selected and a community chosen in the panel, you see the lots in that community that need a walk. The Filters panel is only available on a computer; on a phone, the summary stats are the way to filter.
Sorting Lots
Click on the Lot column header to sort lots alphabetically. Click again to reverse the sort order.
Navigating to a Lot
Click on any row in the table to go directly to that lot's detail page. This takes you to the full lot view within its community, where you can manage tasks, photos, walks, and more.
How to Set a Location for a Lot Without One
These steps are for people who can edit lots.
On Field View, find the lot under Lots Without a Location.
Click the lot's row. On a computer, pointing at the row shows a Set location button, which does the same thing.
The lot's page opens with the Edit Lot panel already open. In the Location field, click the map where the house sits, or click Use my location if you're standing on the lot.
Click Save.
Go back to Field View. The lot is no longer listed.
For every way to place a pin, see Community and Lot Locations.
Understanding the Empty State
If you have no lots assigned to you, Field View displays a message:
No lots assigned to you yet.
All summary stat pills will show 0. Once lots are assigned to you as a project manager, they will appear here automatically.
Don't confuse this with a loading error. If your assigned lots fail to load — usually a temporary connection issue — you'll see a red "Couldn't load your lots" panel in place of the lots list instead, with the message "Something went wrong loading your assigned lots. This is usually temporary — try again." and a Try again button. The summary stat pills show dashes (—) rather than 0 in this case. Click Try again to retry; the rest of the page, including Nearby lots, is unaffected.
Frequently Asked Questions
Why don't I see a lot that was just assigned to me?
Why don't I see a lot that was just assigned to me?
Field View data refreshes periodically. Try refreshing your browser to see the latest assignments.
Why are my summary stats different from the table count?
Why are my summary stats different from the table count?
Summary stats only count active lots (lots not on hold). The table shows all lots including those on hold, though on-hold lots are filtered out by default.
Why did my summary stat filter disappear after I refreshed the page?
Why did my summary stat filter disappear after I refreshed the page?
The filter you set by clicking Overdue Tasks, Late Walks or Need Photos is only kept while you move around inside TPTM. Opening a lot from the filtered list and coming back keeps it; refreshing the page, opening Field View in a new tab, or signing in again starts you unfiltered. Just click the pill again to put the filter back.
Why does the Overdue Tasks number not match the number of lots shown?
Why does the Overdue Tasks number not match the number of lots shown?
The Overdue Tasks pill counts tasks, but the filtered list shows lots. One lot with three overdue tasks adds 3 to the pill and appears once in the list, so the number is usually higher than the number of rows.
On a phone there is one more difference: the pill numbers leave out lots on hold, but the filtered list does not. A lot that is on hold and also has overdue tasks or needs photos appears in the list even though it was never counted. On a computer those lots are hidden by the table's "On Hold" filter unless you turn it off.
What does the "Walk" flag mean exactly?
What does the "Walk" flag mean exactly?
The Walk flag appears when a lot hasn't been walked today, so it's due for a visit. That includes a lot nobody has ever walked — a brand-new lot shows the flag right away. Record a walk and the flag clears for the rest of the day. A lot on an active hold never shows the flag, because a hold pauses the lot. See Lot Walkthroughs for how walkthroughs are recorded, including the 100 ft on-site requirement.
Why is the On Hold badge grey instead of red?
Why is the On Hold badge grey instead of red?
Because a hold usually isn't trouble — it's a pause somebody chose, for a permit, the weather, or a material delay. Red is saved for the Overdue badge, which is work that has slipped. A lot carrying both shows one grey badge and one red one. The grey On Hold badge is the same grey "On Hold" tag you see on the nearby lots list, the community's lots table and the lot's own page, so a held lot reads the same everywhere.
Why is a lot missing from Nearby lots?
Why is a lot missing from Nearby lots?
Three things can hide a lot: it's more than 1,000 feet away, it has no map pin at all, or it's archived. If the card says "No lots within 1,000 feet of you," the data is fine — you're just not close enough yet. Any of your own lots with no pin are listed under Lots Without a Location on Field View, so you can set one.
Why does Nearby lots show lots that aren't mine?
Why does Nearby lots show lots that aren't mine?
That's deliberate. The card is about what's physically around you, so it includes every active pinned lot in range regardless of who manages it. Your own lots are listed first, and lots belonging to someone else show that person's name (or "Unassigned") under the lot name.
Which lots show under Lots Without a Location?
Which lots show under Lots Without a Location?
Your own lots — the ones where you are the project manager — that aren't archived and have no map pin. A lot with only a latitude or only a longitude is listed too, because half a pin can't be used.
Lots on hold are listed as well, since they still need a pin. Lots managed by someone else are never listed here. The summary stat pills and the table's Filters panel don't change this section; they only narrow your assigned lots.
Why does clicking a lot under Lots Without a Location open the lot page instead of the editor?
Why does clicking a lot under Lots Without a Location open the lot page instead of the editor?
Setting a lot's map pin needs permission to edit lots. If you have it, the lot opens with its Edit Lot panel ready for the pin. If you don't, the lot's page opens on its own and there is no Set location button — ask your administrator, or someone who can edit lots, to set the pin.
Do I have to share my location to use Field View?
Do I have to share my location to use Field View?
How do I clear a flag?
How do I clear a flag?
Flags are derived automatically from lot data:
Walk — Complete a new walkthrough on the lot (update the last walkthrough date)
Photo — Upload a new photo to the lot (a photo keeps the lot fresh for 7 days, counted to the hour — one taken at 2:00 PM clears the flag until 2:00 PM seven days later)
Overdue — Complete or reschedule the overdue tasks on the lot
On Hold — Remove the active hold from the lot
Can I customize which lots appear on Field View?
Can I customize which lots appear on Field View?
Field View automatically shows all lots where you are the project manager. You cannot manually add or remove lots, but you can click the Overdue Tasks, Late Walks or Need Photos pill to see just those lots, and on a computer the table's Filters panel narrows them further by community or flag. The Nearby lots card is the exception — it's driven by distance, not assignment.
Is there a limit to how many lots Field View can display?
Is there a limit to how many lots Field View can display?
No. Field View will display all lots assigned to you, regardless of how many there are.
Why do I see "Couldn't load your lots" instead of my lots?
Why do I see "Couldn't load your lots" instead of my lots?
This means your assigned lots failed to load — it's not the same as having no lots assigned, and it's usually a temporary connection issue. Click Try again to retry. If it keeps happening, refresh the page or contact support.
Was this helpful?
More in Tracking Progress
Lot ActivityTask ReportLot WalkthroughsManager viewStill need help? Ask the team